Asset Management Plan (AMP)

Full title: Asset Management Plan for the Municipality of Strathroy-Caradoc

StatusReceived
Council decisionMarch 7, 2022 [S3]
Years it covers2020-2029
Written byPSD Consulting (PSD Citywide), London, Ontario

A big list of everything the town owns - roads, bridges, pipes, buildings, trucks and parks - how worn out each thing is, and how much money the town needs to set aside every year to fix and replace it.

  • The plan was written by PSD Consulting, dated April 2021 (Version 1.0), and uses the town's asset data as of the end of 2019.
  • It says everything the town owns would cost about $743 million to replace, and 60% of it is in fair or better condition. Only 34% of assets had a real inspection; the rest were rated by age.
  • It says the town should spend about $13.2 million a year to keep things in good repair, but was putting about $6.7 million a year into capital, leaving a yearly gap of about $6.5 million and a $46.2 million backlog of work already due.
  • To close the gap for tax-funded assets (roads, bridges, buildings, storm sewers, parks, fleet, equipment) it recommends raising taxes for capital by about 2.0% a year for 15 years. Water and sewer were close to fully funded: no sewer rate increase needed, and about 0.4% a year for water over 20 years.
  • It does not set 'proposed levels of service' (the targets the province required by July 1, 2025). Many current service measures in the plan are still marked 'TBD', and it says those targets should come in a 2025 update.

Why it matters to you

This plan is the town's own estimate of how much it should be saving each year to keep roads, pipes and buildings from falling apart, and the Mayor has said his four-year capital budget will be tied to it. Its numbers were still being quoted in the 2026 budget, so residents can use it to see whether yearly budgets are closing the gap or not.

PSD Consulting presented the plan to Council on March 7, 2022, and Council passed a motion to 'receive the presentation for information' (moved by Councillor Pelkman, seconded by Councillor Kennes, Carried, no recorded vote); no separate motion to adopt, approve or endorse the plan was found in the 2020-2026 meeting records checked.

Promises about this plan

What the plan says to do (22)

Progress only changes when a public record shows something was done. Page numbers point to the plan itself.

How to tell if it is being followed

What has happened since

Words used in this plan

Asset
Something the town owns that provides a service, like a road, water pipe, building or fire truck.
Replacement cost
What it would cost today to replace an asset with a similar new one.
Annual capital requirement
The amount the town should put aside every year so it can repair and replace assets on time.
Infrastructure deficit (funding gap)
The difference between what the town should spend each year on its assets and what it actually spends.
Backlog
Repair or replacement work that is already due or overdue.
Levels of service
How well a service works for people, for example how often water mains break or how smooth roads are.
O. Reg. 588/17
The Ontario rule that says every municipality must have an asset management plan and update it by set deadlines.
Age-based condition
Guessing how worn out something is from how old it is, instead of inspecting it.