Growth and new development

The data centre plan for 700 Adair Blvd

Full title: The Strathroy Data Centre Proposal · Written by John Farrugia

First publishedOctober 25, 2026
Last updatedOctober 26, 2026
Records checked up toOctober 25, 2026
Full report14 pages, with every source

This report explains how a request to rezone an empty industrial field in Strathroy briefly included a data centre, why that part was dropped, and where the request stands now.

What happened

  • In July 2026 the owner of empty industrial land at 700 Adair Blvd asked to change its zoning. The list of new uses included 'Data Centre'. No building was proposed.
  • Many residents objected. An online petition, as reported, passed 1,000 signatures in about a day, and Mayor Colin Grantham told reporters he was against the rezoning.
  • On July 30-31 the applicant dropped the data centre from the request, according to news reports. The revised application has not been posted.
  • At the August 4 public meeting, the County planner said no zone in the town currently allows a data centre. A motion asking staff for the pros and cons of defining 'Data Centre' was lost. None of the votes was a recorded vote.
  • As of October 25, 2026, Council had made no decision on the rezoning. The report's reading is that any decision now appears likely to fall to the next Council.

Why it matters to you

Residents raised worries about power, water, noise and traffic, and the planner said no zone in town currently allows a data centre. The rezoning is still open, and any decision appears likely to fall to the next Council.

Words with a dotted underline: tap them to see what they mean.

What the evidence shows

Shown in recordsTown documents, minutes or other official records show this.Reported, not provenSaid in the news, by a person, or claimed in court. Not proven by records.Still unansweredA question the records do not answer yet.

Key numbers

Size of the site (staff report)Approximately 20.3 ha (50.14 ac) page 2
Petition signatures shown on October 25, 2026 (not independently checked)2,795 page 8

Still unanswered

What's in the full report

Words used in this report

Rezoning / zoning by-law amendment (ZBA)
A change to the town's rules about what a piece of land can be used for.
Future Development (FD) zone
The zone this land has now, before it is rezoned for a specific use.
General Industrial (M2) zone
An industrial zone; the request was for a site-specific version with extra uses added.
Statutory public meeting
The public meeting required by law before Council decides a zoning change, where residents can speak.
Natural heritage
Natural areas that planning rules protect; the northern part of this site is mapped this way.
Environmental Impact Statement (EIS)
A study of how a project could affect the natural features on a site.
Pre-consultation
Talking with town planners before filing an application; a town by-law requires it.
Housekeeping by-law
A general clean-up and update of the town's zoning rules.
Bill 40
A 2025 Ontario energy law; as summarized in the report, a data centre cannot be connected to the grid unless rules set by regulation are met.
Recorded vote
A vote where the minutes list how each member voted.